About Electrical system design and integration

A current challenge to increase the cost efficiency of the offshore wind industry is the capex and operational cost of the electrical distribution system including offshore substations.

ABB can design and integrate the electrical system for HVAC offshore substations. ABB has a proven engineering knowledge to find the right system for optimized Levelized Cost of Energy (LCOE)

With the carve out of its Power Grids business, ABB is flexible with regards to sub supply selection for HV electrical equipment. Sub suppliers can include Hitachi ABB Power Grids, GE, Smit, Chem and others. ABB furthermore has a solid experience in delivering modular packages, such as e-houses, to offshore applications.

Type

Service

References and weblinks

ABB Windpower

Technology readiness level (TRL) (According to API RP 17N)

0 1 2 3 4 5 6 7
Offshore Wind

Offshore Wind

ABB

Company contact

Henrik Pedersen

Business Development Manager

henrik.pedersen@no.abb.com

+47 40 91 84 43

www.abb.com/no

Contact(s) for capability

Company contact

Henrik Pedersen
Business Development Manager
Mob +47 40 91 84 43
Cold Climate & Harsh Environment

Cold Climate & Harsh Environment

Offshore Wind

Offshore Wind

ABB serves with following Capabilities

Latest approved